My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2010-1605
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2010
>
Reso 2010-1605
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2016 4:53:50 PM
Creation date
1/13/2011 2:04:28 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2010-1605
Date (mm/dd/yyyy)
09/16/2010
Description
RFP 10-07-02, Agmt w/Shoreline Foundation Demo/Construct Fishing Pier
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
completion will be extended by the number of calendar days needed to include the excess <br />number of calendar days lost. <br /> <br />.4 acts of the public enemy, acts of the state, Federal or local government in its <br />sovereign capacity, and acts of another contractor in the performance of a contract with the City <br />relating to the Project. <br /> <br />The Contractor shall not be entitled to and hereby expressly waives any extension of time <br />resulting from any condition or cause unless said claim for extensions of time is made in writing <br />to the City and Design Consultant within seventy two hours of the first instance of delay. <br />Circumstances and activities leading to such claim shall be indicated or referenced in a daily <br />field inspection report for the day(s) affected; otherwise, all such claims are waived and released <br />by the Contractor. In every such written claim, the Contractor shall provide the following <br />information: <br /> <br />.1 Nature of the delay; <br /> <br />.2 Date (or anticipated date) of commencement of delay; <br /> <br />.3 Activities on the progress schedule affected by the delay, and/or new activities <br />created by the delay and their relationship with existing activities; <br /> <br />.4 Identification of person(s) or organization(s) or event(s) responsible for the delay; <br /> <br />.5 Anticipated extent of the delay; and <br /> <br />.6 Recommended actions to avoid or minimize the delay. <br /> <br />No change in Contract Amount will be authorized because of adjustment of Contract Time due <br />to unusually severe and abnormal, inclement weather (tornado, hurricane, typhoon or flood). <br /> <br />4.6.2 If abnormal weather conditions are the basis for a Claim for additional time, such Claim <br />shall be documented by the Contractor by data acceptable to the City's Representative <br />substantiating that weather conditions were abnormal for the period of time in question, and <br />could not have been reasonably anticipated, and that weather conditions had an adverse effect on <br />the scheduled construction, <br /> <br />PROVISION 5 <br />CHANGE ORDERS <br /> <br />5.1 The City, as authorized by its governing body, may authorize written Change Orders <br />regarding changes in, or additions to, Work to be performed or materials to be furnished pursuant <br />to the provisions of the Contract Documents. <br /> <br />) <br />23 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.