My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Luke's Landsc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 01-09-01 Parks/Median/Rights-of-Way Maint.
>
Luke's Landsc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 4:05:37 PM
Creation date
1/13/2011 3:59:51 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Parks/Medians/Rights-of-Way Maint.
Bid No. (xx-xx-xx)
01-09-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SUNNY ISLES BEACH <br />Bid No. 01 -09 -01 <br />Page No. 25 <br />PARKS /MEDIANS/RIGHT -OF -WAY MAINTENANCE <br />SPECIFICATIONS <br />b. Clearys 3336 combined with Subdue. <br />C. Kocide - Mancozeb. <br />2. Alternate use of fungicides as dictated by existing <br />conditions. <br />3. Treatment for lethal yellowing: Apply an injection of OTC, <br />5 -8 cc. Per tree per application. These treatments are to <br />occur on an "as needed" basis only and as directed by City. <br />C. Insect Control <br />1. Six applications per year, or as needed to control insect <br />infestation, using Orthene, Cygon, or Lindane. ( Lindane is <br />2. to be used in limited amounts and only if evidence of <br />beetles is present). <br />3. Any spraying of top of palms must occur on weekdays <br />between the hours of 4 A.M. and 7 A.M. <br />3. Requirements <br />A. Date Palm pest control contractor must be a State of Florida <br />licensed pest control operator within a minimum of (5) years of <br />experience in this type of work. <br />B. Observation: It shall be the contractors obligation to perform <br />regular monthly inspections of the palms and report to the City any <br />site condition which may be detrimental to the health and vitality <br />of the palms. Further, the Contractor is responsible to report the <br />development of disease or other problems along with <br />recommended solutions. These reports are to be written and <br />should be received by the City no later than ten days after each <br />inspection. It is required that the City be notified in advance of <br />planned activities in order to allow them to witness and record the <br />applications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.