My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Luke's Landsc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 01-09-01 Parks/Median/Rights-of-Way Maint.
>
Luke's Landsc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 4:05:37 PM
Creation date
1/13/2011 3:59:51 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Parks/Medians/Rights-of-Way Maint.
Bid No. (xx-xx-xx)
01-09-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br />CITY OF SUNNY ISLES BEACH <br />Bid No. 01 -09 -01 <br />1 Page No. 31 <br />PARKS/MEDIANS/RIGHT-OF-WAY MAINTENANCE <br />' SPECIFICATIONS <br />show completion of maintenance items previously described, the City shall request, and require <br />' corrective action to be taken at no charge to the City. <br />3. Payment for work shall be authorized upon evidence of completion, and will occur on a <br />' monthly basis. <br />4. Any additional work requested within the scope of work shall be charged at the cost per cut <br />tor unit price rate. The contractor will be given at least 24 hours notice prior to a call for service. <br />5. NON - CONFORMANCE TO CONTRACT CONDITIONS: <br />The City of Sunny Isles Beach may withhold payment or reject areas which are found, upon <br />examination, not to meet the specification requirements. Upon written notifications of rejection, <br />subject areas shall be rectified within five (5) calendar days by the vendor at his expense. <br />Rejected areas left longer than fifteen (15) calendar days will be regarded as abandoned. <br />Rejection for non - conformance, failure to provide services conforming to specifications, or <br />failure to meet service schedules, may result in the Contractor being held in default and shall <br />authorize the City to terminate the contract upon notice to the Contractor. <br />1 <br />t <br />� I <br />F� <br />
The URL can be used to link to this page
Your browser does not support the video tag.