My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Luke's Landsc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 01-09-01 Parks/Median/Rights-of-Way Maint.
>
Luke's Landsc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 4:05:37 PM
Creation date
1/13/2011 3:59:51 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Parks/Medians/Rights-of-Way Maint.
Bid No. (xx-xx-xx)
01-09-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'1 <br />CITY OF SUNNY ISLES BEACH <br />Bid No. 01 -09 -01 <br />' Page No. 30 <br />PARKS /MEDIANS /RIGHT -OF -WAY MAINTENANCE <br />SPECIFICATIONS <br />D. Mow all Bermuda turf, not to exceed a 1 1/2" height, with a `Reel' type mower. <br />Remove all clippings with each cut. Frequency of mowing will be as defined in <br />Section R.1.A. <br />E. Use `Choice' mole cricket control (on Bermuda turf) chemical once per year <br />' during the month of May. Follow manufacturers instructions for application <br />methods and amounts. <br />' F. Apply Diazanon, on Bermuda turf, for worm control, once during the month of <br />October and once during the month of April (2 applications). Follow <br />Imanufacturers instructions for application methods and amounts. <br />G. For fungus control, on Bermuda turf, and on an "as needed" and curative basis <br />only. Apply Daconil fungicide at the first appearance of fungus. Follow <br />manufacturers instructions for application methods and amounts. <br />' H. For weed control, on Bermuda turf, use (2) applications of Pendulum or Ronstar. <br />The first application is to occur in March and the second application is to occur in <br />September. Follow manufacturers instructions for application methods and <br />amounts. <br />I. For fertilization on Bermuda turf apply Lesco 13 -2 -13 a minimum of (4) times <br />' per year to effect 8 pounds of nitrogen per 1000 sq. Ft. per year. Contractor is <br />responsible for contracting with A & L Laboratories, Pompano Beach, Florida, <br />(954)972 -3255, to complete (2) soil analysis per year to verify the minor element <br />requirements, and adjust fertilizer application as needed. Submit soil analysis to <br />City for review by City Landscape Architect. <br />' T. PAYMENT <br />1. The payment process begins when the contractor notifies the City Manager or designee of <br />work completed. <br />2. The contractor is to notify the City Manager or designee's office by 9:00 a.m. of the <br />following work day regarding work areas completed. Following such notice, the City shall <br />inspect the maintenance area indicated within 24 hours. If the contractor's performance does not <br />
The URL can be used to link to this page
Your browser does not support the video tag.