' 1.07 SUBSTITUTIONS AND PRODUCT OPTIONS <br />A. Products List: <br />' 1. Within 30 days after the effective date of the Agreement, submit to the Engineer a <br />complete list of major products proposed to be used, with the name of the <br />' manufacturer and the installing subcontractor. <br />B. Contractor's Options: <br />1. For Products specified only by reference standard, select any product meeting that <br />standard. <br />' 2. For Products specified by naming several products or manufacturers, select any <br />one of the products or manufacturers named, which complies with the <br />specifications. <br />1 <br />1 06111 01600 -4 03- 4138.B <br />E. <br />Moving parts shall be rotated a minimum of once weekly to insure proper lubrications and <br />to avoid metal -to -metal "welding ". Upon installation of the equipment, the Contractor <br />shall start the equipment, at least half load, once weekly for an adequate period of time to <br />' <br />insure that the equipment does not deteriorate from lack of use. <br />F. <br />All materials which, in the opinion of the Engineer, have become so damaged as to be <br />unfit for the use intended or specified shall be promptly removed from the site of the <br />work, and the Contractor shall receive no compensation for the damaged material or its <br />removal. <br />1 <br />G. <br />Arrange storage in a manner to provide easy access for inspection. Make periodic <br />inspections of stored Products to assure that Products are maintained under specific <br />' <br />conditions, and free from damage or deterioration. <br />H. <br />Protection After Installation: <br />1. Provide substantial coverings as necessary to protect installed products from <br />damage from traffic and subsequent construction operations. Remove covering <br />' <br />when no longer needed. <br />I. <br />The Contractor shall be responsible for all materials, equipment, and supplies sold and <br />' <br />delivered to the Owner under this Contract until final inspection of the work and <br />acceptance thereof by the Owner. In the event any such material, equipment, and supplies <br />are lost, stolen, damaged, or destroyed prior to final inspection and acceptance, the <br />Contractor shall replace same without additional cost to the Owner. <br />' <br />J. <br />Should the Contractor fail to take proper action on storage and handling of equipment <br />supplied under this Contract within seven days after written notice to do so has been <br />' <br />given, the Owner retains the right to correct all deficiencies noted in previously <br />transmitted written notice and debit the cost associated with these corrections from the <br />Contractor's Contract. These costs may be comprised of expenditures for labor, equipment <br />' <br />usage, administrative, clerical, engineering and any other costs associated with making the <br />necessary corrections. <br />' 1.07 SUBSTITUTIONS AND PRODUCT OPTIONS <br />A. Products List: <br />' 1. Within 30 days after the effective date of the Agreement, submit to the Engineer a <br />complete list of major products proposed to be used, with the name of the <br />' manufacturer and the installing subcontractor. <br />B. Contractor's Options: <br />1. For Products specified only by reference standard, select any product meeting that <br />standard. <br />' 2. For Products specified by naming several products or manufacturers, select any <br />one of the products or manufacturers named, which complies with the <br />specifications. <br />1 <br />1 06111 01600 -4 03- 4138.B <br />