My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pios & Sons
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-06-01) Median Fencing Improv.
>
Responses
>
Pios & Sons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2012 10:36:16 AM
Creation date
1/19/2011 10:18:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Fencing Improv.
Bid No. (xx-xx-xx)
05-06-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br />B. Submittals Schedule for Shop Drawings, and Samples in accordance with Section 01340. <br />Show: <br />1. The dates for Contractor's submittals. <br />2. The date submittals will be required for owner furnished products, if applicable. <br />3. The dates approved submittals will be required from the Engineer. <br />C. A list of all long lead items (equipment, materials, etc). <br />1.05 PROGRESS REVISIONS <br />A. Indicate progress of each activity to date of submission. <br />B. Show changes occurring since previous submission of schedule: <br />1. Major changes in scope. <br />2. Activities modified since previous submission. <br />3. Revised projections of progress and completion. <br />4. Other identifiable changes. <br />C. Provide a narrative report as needed to define: <br />1. Problem areas, anticipated delays, and the impact on the schedule. <br />2. Corrective action recommended, and its effect. <br />The effect of changes on schedules of other prime contractors. <br />1.06 SUBMISSIONS <br />A. Submit initial schedules to the Engineer within 10 days after the effective date of the <br />Agreement. <br />1. The Engineer will review schedules and return review copy within 21 days after <br />receipt. <br />2. If required, resubmit within 7 days after return of review copy. <br />B. Submit 5 copies of revised monthly progress schedules with that month's application for <br />payment. <br />06/05 01310 -3 03-4138.13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.