My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pios & Sons
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-06-01) Median Fencing Improv.
>
Responses
>
Pios & Sons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2012 10:36:16 AM
Creation date
1/19/2011 10:18:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Fencing Improv.
Bid No. (xx-xx-xx)
05-06-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Format of listings: The chronological order of the start of each item of work for each <br />structure. <br />C. Identification of listings: By major specification section numbers as applicable and <br />structure. <br />1.04 CONTENT OF SCHEDULES <br />A. Construction Progress Schedule: <br />1. Show the complete sequence of construction by activity. <br />2. Show the dates for the beginning of, and completion of, each major element of <br />construction in no more than a two -week increment scale. Specifically list, but <br />not limited to: <br />a. Receiving Materials <br />b. Pipeline Installations <br />C. Testing <br />d. Restoration <br />e. Startup <br />f. Record Drawings <br />g. Permits <br />h. Punch List <br />i. Owner Activities, Including Inspections <br />3. Show projected percentage of completion for each item, as of the first of each <br />month. <br />4. Show projected dollar cash flow requirements for each month of construction. <br />5. Use of float suppression techniques such as preferential sequencing or logic, <br />special lead /lag logic restraints, and extended activity times are prohibited, and <br />use of float time disclosed or implied by use of alternate float - suppression <br />techniques shall be shared to proportionate benefit of the Owner and Contractor. <br />6. Pursuant to above float - sharing requirement, no time extensions will be granted <br />nor delay damages paid until a delay occurs which (i) impacts Project's critical <br />path, (ii) consumes available float or contingency time, and (iii) extends work <br />beyond contract completion date. <br />7. If the Contractor provides an accepted schedule with an early completion date, <br />the Owner reserves the right to reduce the duration of the work to match the early <br />completion date by issuing a deductive Change Order at no change in Contract <br />Price. <br />06/05 01310 -2 03-4138.B <br />
The URL can be used to link to this page
Your browser does not support the video tag.