My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pios & Sons
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-06-01) Median Fencing Improv.
>
Responses
>
Pios & Sons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2012 10:36:16 AM
Creation date
1/19/2011 10:18:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Fencing Improv.
Bid No. (xx-xx-xx)
05-06-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />F. For all mechanical and electrical equipment furnished, the Contractor shall provide a list <br />including the equipment name, address and telephone number of the manufacturer's <br />representative and service company so that service and spare parts can be readily obtained. <br />In addition, a maintenance and lubrication schedule for each piece of equipment shall be <br />submitted along with each shop drawing submittal. <br />G. All manufacturers or equipment suppliers who propose to furnish equipment or products <br />under Divisions 11, 13, 15 and 16 shall submit an installation list to the Engineer along <br />with the required shop drawings. The installation list shall include at least five <br />installations where identical equipment has been installed and has been in operation for a <br />period of at least one (1) year. <br />H. Only the Engineer will utilize the color "red" in marking Shop Drawing submittals. <br />I. Before final payment is made, the Contractor shall furnish to Engineer two (2) sets of <br />record shop drawings all clearly revised, complete and up to date showing the permanent <br />construction as actually made for all reinforcing and structural steel, miscellaneous metals, <br />process and mechanical equipment, yard piping, electrical system, instrumentation system <br />and irrigation. <br />1.06 WORKING DRAWINGS <br />' A. When used in the Contract Documents, the term "working drawings" shall be considered <br />to mean the Contractor's plans for temporary structures such as temporary bulkheads, <br />support of open cut excavation, support of utilities, ground water control systems, forming <br />' and false -work; for underpinning; and for such other work as may be required for <br />construction, but does not become an integral part of the project. <br />B. Copies of working drawings as noted in subparagraph 1.06A above, shall be submitted to <br />the Engineer where required by the Contract Documents or requested by the Engineer, and <br />shall be submitted at least thirty (30) calendar days (unless otherwise specified by the <br />Engineer) in advance of their being required for work. <br />C. Working drawings shall be signed by a Registered Professional Engineer, currently <br />licensed to practice in the State of Florida and shall convey, or be accompanied by, <br />calculation or other sufficient information to completely explain the structure, machine, or <br />system described and its intended manner of use. Prior to commencing such work, <br />working drawings must have been reviewed without specific exceptions by the Engineer, <br />which review will be for general conformance and will not relieve the Contractor in any <br />way from his responsibility with regard to the fulfillment of the terms of the Contract. All <br />risks of error are assumed by the Contractor; the Owner and Engineer shall have no <br />responsibility therefore. <br />1.07 SAMPLES <br />A. The Contractor shall furnish, for the approval of the Engineer, samples required by the <br />Contract Documents or requested by the Engineer. Samples shall be delivered to the <br />Engineer as specified or directed. The Contractor shall prepay all shipping charges on <br />samples. Materials or equipment for which samples are required shall not be used in work <br />until approved by the Engineer. <br />1 06/05 01340 -5 03- 4138.13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.