My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pios & Sons
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-06-01) Median Fencing Improv.
>
Responses
>
Pios & Sons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2012 10:36:16 AM
Creation date
1/19/2011 10:18:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Fencing Improv.
Bid No. (xx-xx-xx)
05-06-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />No partial submittals will be reviewed. Submittals not complete will be returned to the <br />Contractor, and will not be considered "Rejected" until resubmitted. <br />1.05 SHOP DRAWINGS <br />1 06/05 <br />A. When used in the Contract Documents, the term "Shop Drawings" shall be considered to <br />mean Contractor's plans for material and equipment that become an integral part of the <br />Project. These drawings shall be complete and detailed. Shop Drawings shall consist of <br />fabrication, erection and setting drawings and schedule drawings, manufacturer's scale <br />drawings, and wiring and control diagrams. Cuts, catalogs, pamphlets, descriptive <br />literature, and performance and test data, shall be considered only as supportive to <br />required Shop Drawings as defined above. <br />B. Drawings and schedules shall be checked and coordinated with work of all trades <br />involved, before they are submitted for review by the Engineer and shall bear the <br />Contractor's stamp of approval as evidence of such checking and coordination. Drawings <br />or schedules submitted without this stamp of approval shall be returned to the Contractor <br />for resubmission. <br />C. Each Shop Drawing, shall have a blank area 3 1/2 inches by 3 1/2 inches, located adjacent <br />to the title block. The title block shall display the following: <br />1. Number and title of the drawing. <br />2. Date of drawing or revision. <br />3. Name of project building or facility. <br />4. Name of contractor and subcontractor submitting drawing. <br />5. Clear identification of contents and location of work. <br />6. Specification title and number. <br />D. If drawings show variations from Contract requirements because of standard shop practice <br />or for other reasons, the Contractor shall describe such variations in his letter of <br />transmittal. If acceptable, proper adjustment in the Contract shall be implemented where <br />appropriate. If the Contractor fails to describe such variations he shall not be relieved of <br />the responsibility for executing the work in accordance with the Contract, even though <br />such drawings have been reviewed. <br />E. Data on materials and equipment include, without limitation, materials and equipment <br />lists, catalog data sheets, cuts, performance curves, diagrams, materials of construction and <br />similar descriptive material. Materials and equipment lists shall give, for each item <br />thereon, the name and location of the supplier or manufacturer, trade name, catalog <br />reference, size, finish and all other pertinent data. <br />01340 -4 03-4138.B <br />
The URL can be used to link to this page
Your browser does not support the video tag.