Laserfiche WebLink
' G. The Contractor shall be responsible for and bear all cost of damages that may result from <br />the ordering of any material or from proceeding with any part of work prior to the review <br />' by Engineer of the necessary Shop Drawings. <br />1.04 ENGINEER'S REVIEW OF SHOP DRAWINGS <br />' A. The Engineer's review of drawings, data and samples submitted by the Contractor will <br />cover only general conformity to the Specifications, external connections, and dimensions <br />that affect the installation. The Engineer's review and exceptions if any, will not constitute <br />an approval of dimensions, quantities, and details of the material, equipment, device, or <br />item shown. <br />' B. The review of drawings and schedules will be general, and shall not be construed: <br />1. As permitting any departure from the Contract requirements; <br />2. As relieving the Contractor of responsibility for any errors, including details, <br />dimensions, and materials; <br />' 3. As approving departures from details furnished by the Engineer, except as <br />otherwise provided herein. <br />C. If the drawings or schedule as submitted describe variations per subparagraph (1.05.C), <br />and show a departure from the Contract requirements which Engineers finds to be in the <br />interest of the Owner and to be minor as not to involve a change in the Contract Price or <br />time for performance, the Engineer may return the reviewed drawings without noting an <br />exception. <br />' <br />D. <br />When reviewed by the Engineer, each of the Shop Drawings will be identified as having <br />received such review being so stamped and dated. Shop Drawings stamped "REJECTED" <br />and with required corrections shown will be returned to the Contractor for correction and <br />' <br />re- submittal. <br />E. <br />Re- submittals will be handled in the same manner as the first submittals. On resubmittals, <br />the Contractor shall direct specific attention, in writing or on resubmitted Shop Drawings, <br />to revisions other than the corrections requested by the Engineer on previous submissions. <br />The Contractor shall make any corrections required by the Engineer. <br />' <br />F. <br />If the Contractor considers any correction indicated on the drawings to constitute a change <br />to the Contract Drawings or Specifications, the Contractor shall give written notice thereof <br />to the Engineer. <br />G. <br />The Engineer will review a submittal/resubmittal a maximum of three (3) times after <br />which cost of review will be borne by the Contractor. The cost of engineering shall be <br />' <br />equal to the Engineer's charges to the Owner under the terms of the Engineer's agreement <br />with the Owner. <br />' <br />H. <br />When the Shop Drawings have been completed to the satisfaction of the Engineer, the <br />Contractor shall carry out the construction in accordance therewith and shall make no <br />' <br />further changes therein except upon written instructions from the Engineer. <br />1 06/05 01340 -3 03- 4138.B <br />