My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pios & Sons
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-06-01) Median Fencing Improv.
>
Responses
>
Pios & Sons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2012 10:36:16 AM
Creation date
1/19/2011 10:18:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Fencing Improv.
Bid No. (xx-xx-xx)
05-06-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Provide to the laboratory the preliminary design mix proposed to be used for concrete, <br />and other materials mixes which require control by the testing laboratory. <br />D. Materials and equipment used in the performance of work under this Contract are subject <br />to inspection and testing at the point of manufacture or fabrication. Standard <br />specifications for quality and workmanship are indicated in the Contract Documents. The <br />Engineer may require the Contractor to provide statements or certificates from the <br />manufacturers and fabricators that the materials and equipment provided by them are <br />manufactured or fabricated in full accordance with the standard specifications for quality <br />and workmanship indicated in the Contractor Documents. All costs of this testing and <br />providing statements and certificates shall be a subsidiary obligation of the Contractor, <br />and no extra charge to the Owner shall be allowed on account of such testing and <br />certification. <br />E. Furnish incidental labor and facilities: <br />1. To provide access to Work to be tested <br />2. To obtain and handle samples at the Project site or at the source of the product to <br />be tested <br />3. To facilitate inspections and tests <br />4. For storage and curing of test samples <br />F. Notify laboratory sufficiently in advance of operations to allow for laboratory assignment <br />of personnel and scheduling of tests. <br />G. Employ and pay for the services of the same or a separate, equally qualified independent <br />testing laboratory to perform additional inspections, sampling and testing required for the <br />Contractor's convenience. <br />H. Provide the Engineer with a copy of all test and reports. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br />END OF SECTION <br />06/05 01410 -2 03-4138.B <br />
The URL can be used to link to this page
Your browser does not support the video tag.