My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pios & Sons
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-06-01) Median Fencing Improv.
>
Responses
>
Pios & Sons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2012 10:36:16 AM
Creation date
1/19/2011 10:18:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Fencing Improv.
Bid No. (xx-xx-xx)
05-06-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 SECTION 01505 <br />CONTROL OF WORK <br />1.01 QUALITY OF WORK <br />' A. The Contractor shall furnish personnel and equipment which will be efficient, appropriate <br />and large enough to secure a satisfactory quality of work and a rate of progress which will <br />insure the completion of the work within the time stipulated in the Proposal. If at any time <br />1 such personnel appear to the Engineer to be inefficient, inappropriate or insufficient for <br />securing the quality of work required or for producing the rate of progress aforesaid, he <br />may order the Contractor to increase the efficiency, change the character or increase the <br />' personnel and equipment, and the Contractor shall conform to such order. Failure of the <br />Engineer to give such order shall in no way relieve the Contractor of his obligations to <br />secure the quality of the work and rate of progress required. <br />i1.02 OBSTRUCTIONS <br />A. The attention of the Contractor is drawn to the fact that during digging at the Project site <br />the possibility exists of the Contractor encountering various water, sewer, petroleum, gas, <br />telephone, electrical, or other lines not shown on the Drawings. The Contractor shall <br />' exercise extreme care before and during digging to locate and flag these pipes so as to <br />avoid damage to the existing pipes. Should damage occur to an existing pipe, The <br />Contractor shall repair the pipe at no cost to the City. <br />' B. The Contractor shall protect all existing utilities and improvements not designated for <br />removal and shall restore damaged or temporarily relocated utilities and improvements to a <br />' condition equal to or better than they were prior to such damage or temporary relocation, <br />all in accordance with requirements of the Contract Documents. <br />C. The Contractor shall verify the exact locations and depths of all utilities shown and the <br />Contractor shall make exploratory excavations of all utilities that may interfere with the <br />work. All such exploratory excavations shall be performed as soon a practicable after <br />award of the contract and, in any event, a sufficient time in advance of construction to <br />avoid possible delays to the Contractor's work. When such exploratory excavations show <br />the utility location as shown to be in error, the Contractor shall so notify the Engineer. <br />D. The number of exploratory excavations required should be that number which is sufficient <br />to determine the alignment and grade of the utility. Test pits shall be dug at the Contractor's <br />expense, as directed. <br />E. The Contractor shall protect all Underground Utilities and other improvements that may be <br />impaired during construction operations. It shall be the Contractor's responsibility to <br />ascertain the actual location of all existing utilities and other improvements that will be <br />encountered in its construction operations, and to see that such utilities or other <br />improvements are adequately protected from damage due to such operations. The <br />Contractor shall take all possible precautions for the protection of unforeseen utility lines to <br />provide for uninterrupted service and to provide such special protection as may be <br />necessary. <br />1 06/05 01505 -1 03- 4138.B <br />
The URL can be used to link to this page
Your browser does not support the video tag.