My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pios & Sons
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-06-01) Median Fencing Improv.
>
Responses
>
Pios & Sons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2012 10:36:16 AM
Creation date
1/19/2011 10:18:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Fencing Improv.
Bid No. (xx-xx-xx)
05-06-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 6. Insect plants at least once a week and perform maintenance promptly. Replace <br />impaired or dead plants promptly. Do not wait until near the end of the guarantee <br />period to make replacements of plants which have become unacceptable. <br />7. Remove soil ridges from around watering basins prior to end of maintenance <br />period, as directed by the Landscape Architect. <br />B. Watering: Water when soil moisture is below optimum level for best plant growth. <br />' 3.11 CLEANING <br />A. Fill all pits /depressions in holding area and rough grade to meet surrounding elevations. <br />Remove any organic or other debris resulting from the plant relocation process. <br />B. Sweep and wash all paved surfaces. <br />' C. Remove planting debris from project site and holding area. <br />D. Remove soil conditioners, soil mixes, gravel, etc. from project site and holding area. <br />SUBSTANTIAL COMPLETION, INSPECTION AND ACCEPTANCE <br />Inspection of the entire project or designated portions thereof shall be made upon written request of the <br />Contractor. At that time, if all work is satisfactory and complete according to the conditions of the <br />Contract, the Architect shall declare the work substantially complete. <br />Contractor's written request for review of the work or any designate portion thereof shall be received by <br />tArchitect at least five (5) days before anticipated date of inspection. <br />Plants that have died or in unhealthy or badly impaired condition on inspection shall be treated or <br />' replaced within 14 days at no additional cost to Owner. <br />Replace rejected plants within two weeks of inspection. <br />' Substantial completion of the work for the entire project or designated portions thereof shall constitute <br />the beginning of guarantee period. <br />' Contractor's responsibility for maintenance (exclusive of replacement within guarantee period) shall <br />terminate on date of final acceptance of the entire project according to the conditions of the Contract, <br />provided Contractor has supplied Landscape Architect with three (3) copies of written maintenance <br />' instructions as required under Paragraph 1.05C of this Section. <br />1 END OF SECTION <br />1 06/05 02490 -13 03- 4138.B <br />
The URL can be used to link to this page
Your browser does not support the video tag.