Laserfiche WebLink
D. The re- tempering of concrete or mortar which has partially hardened, that is, mixing with or <br />without additional cement, aggregate, or water, will not be permitted. <br />' E. Attention is called to the importance of dispatching trucks from the hatching plant so that <br />they shall arrive at the site of the work just before the concrete is required, thus avoiding <br />excessive mixing of concrete while waiting or delays in placing successive layers of <br />' concrete in the forms. <br />3.03 FIELD TESTS <br />A. Sets of four field control cylinder specimens will be taken at random by the Engineer <br />during the progress of the work, in conformity with ASTM Designation C31; the total <br />' number of specimens taken on the project may average one set per 150 cubic yards, and in <br />general not less than one set of specimens will be taken on any one day when concrete is <br />being placed. When average ultimate 28 -day strength of control cylinders in any set falls <br />below the required ultimate strength or below proportional minimum 7 day strengths where <br />' proper relation between 7 and 28 day strengths have been established by tests, proportions, <br />water content, or temperature conditions shall be changed to secure the required strength. <br />B. The Contractor shall cooperate in the making of such tests to the extent of allowing free <br />access to the work for the selection of samples, providing heated (when required) moist <br />storage facilities for specimens, affording protection to the specimens against injury or loss <br />through his operations, and furnishing material and labor required for the purpose of taking <br />' concrete cylinder samples, curing boxes and shipping boxes. All shipping of specimens will <br />be paid for by the Owner. <br />' <br />C. <br />Slump tests will be made in the field by the testing laboratory. <br />3.04 INSPECTION AND CONTROL - <br />' <br />A. <br />The preparation of forms, placing of reinforcing steel, conduits, pipes, and sleeves, <br />hatching, mixing, transportation, placing and curing of concrete shall be at all times under <br />the inspection of the Engineer. <br />B. <br />The Contractor shall engage the services of an approved testing laboratory to establish the <br />basic mixtures of concrete as required by the specifications. <br />rC. <br />The Owner will engage the services of a testing laboratory to test field control cylinder <br />specimens and to conduct other tests as specified herein or as deemed required by the <br />' <br />Engineer to insure the quality. <br />D. <br />Air entrainment shall be measured by the testing laboratory or his representative at time of <br />concrete deposit in accordance with ASTM Designation C231. <br />' <br />3.05 CONCRETE <br />APPEARANCE <br />A. <br />Concrete for every part of the work shall be homogeneous structure which, when hardened, <br />will have the required strength, durability and appearance. <br />B. <br />Formwork, mixtures and concrete placement workmanship shall be such that concrete <br />surfaces, when exposed, will require only minimal finishing with no excess honeycombing, <br />voids or irregular color lines. <br />01105 03300 -7 03-4138.B <br />