My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pios & Sons
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-06-01) Median Fencing Improv.
>
Responses
>
Pios & Sons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2012 10:36:16 AM
Creation date
1/19/2011 10:18:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Fencing Improv.
Bid No. (xx-xx-xx)
05-06-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. As soon as the forms have been stripped and the concrete surfaces exposed, fins and other <br />projections shall be removed, recesses left by the removal of form ties (except where ties <br />are left in place during sandblasting) shall be filled and surface defects which do not impair <br />structural strength shall be repaired. Clean all exposed concrete surfaces and adjoining <br />work stained by leakage of concrete, to approval of the Engineer. <br />C. Immediately after removal of forms remove plugs and break off metal ties as required by <br />Paragraph 3.06. Holes are then to be promptly filled upon stripping as follows: Moisten <br />the hole with water, followed by a 1/16 inch brush coat of neat cement slurry mixed to the <br />consistency of a heavy paste. Immediately plug the holes with 1 1.5 mixture of cement and <br />concrete sand mixer slightly damp to the tough (just short of "balling "). Hammer the grout <br />into the hole until dense, and an excess of paste appears on the surface in the form of a <br />spider web. Trowel smooth with heavy pressure. Avoid burnishing. <br />D. Rub lightly with a fine carborandum stone at an age of 1 to 5 days if necessary to bring the <br />surface down with the parent concrete. Exercise care to avoid damaging or straining the <br />virgin skin of the surrounding parent concrete. Wash thoroughly to remove all rubbed <br />matter. <br />1 06/05 03300 -12 03 -41383 <br />E. Defective concrete and honeycombed areas shall be chipped reasonably square and at least <br />1 inch deep to sound concrete by means of hand chisels or pneumatic chipping hammers. <br />Irregular voids or surface stones need not be removed if they are sound, free of laitance, <br />and firmly embedded in the parent concrete, subject to Engineer's final inspection. If <br />' <br />honeycomb exists around reinforcement, chip to provide a clear space at least 3/8 inch wide <br />all around the steel. For areas less than 1 1/2 inch deep, the patch may be made in the same <br />manner as described above for filling for tie holes, care being exercised to use adequately <br />dry (non - trowelable) mixtures and to avoid sagging. Thick repairs will require build -up in <br />successive 1 1/2 inch layers on successive days, each layer being applied (with slurry, etc.) <br />as described above. To aid strength and bonding of the multiple layer repairs, the Engineer <br />may order the use of Embeco non - shrink, metallic aggregate by the Master Builders <br />Company, Cleveland, OH or Ironite by Fox Industries, Madison IL as an additive as <br />follows: <br />Material Volumes Weights <br />Cement 1.0 1.0 <br />Embeco 0.15 0.25 <br />Sand 1.5 1.5 <br />F. For very heavy (generally formed) patches; the Engineer may order the addition of pea <br />gravel to the mixture and the proportions modified as follows: <br />Material Volumes Weights <br />Cement 1.0 1.0 <br />Embeco 0.2 0.33 <br />' <br />Sand 1.0 1.0 <br />Pea Gravel 1.5 1.5 <br />iG. <br />In cases where the Embeco is employed in multiple patches and a rusty finish is not desired <br />on the surface, such as exposed faces of walls, etc., the final layer (or at least the final 1/2 <br />inch) shall be composed of the 1 1.5 grout without Embeco. After hardening, rub lightly as <br />described above for form tie holes. <br />1 06/05 03300 -12 03 -41383 <br />
The URL can be used to link to this page
Your browser does not support the video tag.