My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pios & Sons
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-06-01) Median Fencing Improv.
>
Responses
>
Pios & Sons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2012 10:36:16 AM
Creation date
1/19/2011 10:18:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Fencing Improv.
Bid No. (xx-xx-xx)
05-06-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LJ <br />�l <br />J <br />1 <br />I� <br />�J <br />1 <br />1 <br />t <br />F� <br />P, <br />SECTION 01025 <br />MEASUREMENT AND PAYMENT <br />PART 1 - GENERAL <br />1.01 RELATED REQUIREMENTS <br />A. General provisions of Contract, including General and Supplementary Conditions. <br />B. Other Division -I Specification Sections. <br />1.02 SECTION INCLUDES <br />A. Administrative and procedural requirements for determining Work completed under unit <br />price contract. <br />1.03 GENERAL REQUIREMENTS <br />A. Lump Sum and unit prices shall include the providing of all costs required for the <br />complete demolition as noted, construction of the specified unit of work including cost of <br />materials and delivery; cost of installation labor, including social security, insurance, and <br />other required fringe benefits, workman's compensation insurance; bond premiums; <br />rental of equipment and machinery; taxes; testing; surveys and other incidental expenses; <br />and supervision. <br />B. The Owner reserves the right to reject the Contractor's measurement of completed work <br />that involves use of established unit prices, and to have this Work measured by an <br />independent surveyor acceptable to the Contractor at the Owner's expense. <br />C. Contract Sum adjustments will be by Change Order on basis of net accumulative change <br />for each unit price category. <br />1. Except as otherwise specified, unit prices shall apply to both deductive and <br />additive variations of quantities. <br />2. Lump sum and unit prices in the Agreement shall remain in effect until date of <br />final completion of the entire Work. <br />D. Partial payment for material and equipment properly stored and protected will be made in <br />accordance with requirements of the General Conditions. <br />E. Payment will be made at the respective contract unit and lump sum price for each item <br />shown in the Agreement, installed and accepted, which price and payment shall constitute <br />full compensation for furnishing all materials and performing all Work in connection <br />therewith and incidental thereto. No separate payment will be made for testing. <br />1 06/05 01025 -1 03- 4138.B <br />
The URL can be used to link to this page
Your browser does not support the video tag.