Laserfiche WebLink
IF. Unit Price Abbreviations: <br />PART 2 - PRODUCTS (Not applicable) <br />' PART 3 - EXECUTION <br />' 3.01 MEASUREMENT AND PAYMENT <br />A. Furnish and Install Black Metal Picket Fence <br />1. <br />Lineal Feet - LF <br />three -foot (3') high black metal picket fence will be based upon the actual <br />2. <br />Acre - AC <br />3. <br />Cubic Yard - CY <br />black metal picket fence will be made at the unit price per linear feet named in <br />4. <br />Square Yard - SY <br />5. <br />Each - EA <br />material, restoration of areas disturbed by the operations, and the appurtenant <br />6. <br />Lump Sum - LS <br />7. <br />8. <br />Ton - TN <br />Net Mile - NM <br />Repair /Reset Existing Black Metal Picket Fence <br />9. <br />Gross Mile - GM <br />10. <br />Gallons - GA <br />' <br />11. <br />Million Gallons - MG <br />PART 2 - PRODUCTS (Not applicable) <br />' PART 3 - EXECUTION <br />' 3.01 MEASUREMENT AND PAYMENT <br />A. Furnish and Install Black Metal Picket Fence <br />1 06/05 01025 -2 03- 4138.B <br />1. Measurement for payment for furnishing and installing 1,175 +/- linear feet of <br />three -foot (3') high black metal picket fence will be based upon the actual <br />number of linear feet of such fencing, all in accordance with the requirements of <br />the Contract Documents. <br />2. Payment for furnishing and installing 1,175 +/- linear feet of three -foot (3') high <br />black metal picket fence will be made at the unit price per linear feet named in <br />the Bid Schedule which price shall constitute full compensation for completing <br />said work, including all earthwork, construction of fencing, disposal of excess <br />material, restoration of areas disturbed by the operations, and the appurtenant <br />items for which separate payment is not specifically included in the Bid <br />Schedule. <br />rB. <br />Repair /Reset Existing Black Metal Picket Fence <br />1. Measurement for payment for repairing /resetting 16 +/- linear feet of existing <br />three -foot (3') high black metal picket fencing will be based upon the actual <br />number of linear feet of such fencing, all in accordance with the requirements of <br />the Contract Documents. <br />2. Payment for repairing/resetting 16 +/- linear feet of existing three -foot (3') high <br />black metal picket fencing will be made at the unit price per linear feet named in <br />the Bid Schedule which price shall constitute full compensation for completing <br />said work, including all earthwork, construction of fencing, disposal of excess <br />material, restoration of areas disturbed by the operations, and the appurtenant <br />' <br />items for which separate payment is not specifically included in the Bid <br />Schedule. <br />1 06/05 01025 -2 03- 4138.B <br />