Laserfiche WebLink
C. Project Mobilization <br />1. The project mobilization item shall be administered in accordance with the <br />Florida Department of Transportation, Standard Specifications for Road & <br />Bridge Construction (latest edition); MOBILIZATION. <br />2. The maximum amount allowed for the mobilization item shall be ten percent <br />(10 %) of the total contract amount. <br />3. Mobilization includes, but is not limited to, mobilization of equipment, all <br />surveying, all supervision, cost of all bonds and warranties, all permit fees, and <br />all insurance. <br />3.02 PROTECTION <br />A. Where pavement, trees, shrubbery, fences or other property or surface structures have <br />been damaged, removed or disturbed by the Contractor, whether deliberately or through <br />failure to carry out the requirements of the Contract Documents, state laws, municipal <br />ordinances or the specific direction of the Engineer, or through failure to employ usual <br />and reasonable safeguards, such property and surface structures shall be replaced or <br />repaired at the expense of the Contractor to a condition equal to that before work began <br />within a time frame approved by the Engineer. <br />3.03 SUBMITTALS <br />A. On lump sum items, a complete schedule of values must be submitted at the pre - <br />construction meeting by the contractor. <br />END OF SECTION <br />06/05 01025 -3 03 -41383 <br />