Laserfiche WebLink
i <br />1 1.05 HURRICANE PREPAREDNESS PLAN <br />A. Within ten days of the date of Notice to Proceed, the Contractor shall submit to the <br />Engineer and Owner a Hurricane Preparedness Plan. The plan should outline the necessary <br />measures, which the Contractor proposes to perform at no additional cost to the Owner in <br />case of a hurricane warning. <br />B. In the event of inclement weather or whenever the Engineer shall direct; the Contractor will <br />cause Subcontractors to protect carefully the Work and materials against damage or injury <br />from the weather. If, in the opinion of the Engineer, any portion of Work or materials shall <br />have been damaged or injured by reason of failure on the part of Contractor or any <br />' Subcontractor to so protect the Work, such Work and materials shall be removed and <br />replaced at the expense of the Contractor. <br />1.06 EQUIPMENT, TESTING & INSPECTION <br />A. Regardless of the number of days specified in the individual sections for the manufacturers <br />representative to be present on the site for inspection and testing, if the equipment fails to <br />perform as specified then the representative shall remain on site until the malfunction is <br />corrected and the Owner received specified days of inspection or testing. <br />B. The cost for the additional days required shall not be added to the cost of the Owner, but <br />shall be to the account of the Contractor. <br />PART 2 — PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br />END OF SECTION <br />1 <br />t <br />it <br />1 06/05 01030 -2 03 -41383 <br />