My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pios & Sons
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-06-01) Median Fencing Improv.
>
Responses
>
Pios & Sons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2012 10:36:16 AM
Creation date
1/19/2011 10:18:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Fencing Improv.
Bid No. (xx-xx-xx)
05-06-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01045 <br />CUTTING AND PATCHING <br />PART 1 - GENERAL <br />1.01 WORK INCLUDED <br />A. Contractor shall be responsible for all cutting, fitting and patching, including attendant <br />excavation and backfill, required to complete the work or to: <br />1. Make its several parts fit together properly. <br />2. Uncover portions of the Work to provide for installation of ill -timed work. <br />3. Remove and replace defective work. <br />4. Remove and replace work not conforming to requirements of Contract <br />Documents. <br />5. Remove samples of installed work as specified for testing. <br />6. Provide routine penetrations of non - structural surfaces for installation of piles, <br />piping, and concrete footings. <br />7. Investigate subsurface conditions or utilities. <br />1.02 RELATED WORK <br />A. Section 01010: Summary of Work <br />1.03 SUBMITTALS <br />A. Submit a written request to the Engineer well in advance of executing any cutting or <br />alteration that affects: <br />1. Work of the Owner or any separate contractor. <br />2. Structural value or integrity of any element of the Project. <br />3. Integrity or effectiveness of weather- exposed or moisture- resistant elements or <br />systems. <br />4. Efficiency, operational life, maintenance or safety of operational elements. <br />Visual qualities of sight- exposed elements. <br />06/05 01045 -1 03 -41383 <br />
The URL can be used to link to this page
Your browser does not support the video tag.