My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pios & Sons
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-06-01) Median Fencing Improv.
>
Responses
>
Pios & Sons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2012 10:36:16 AM
Creation date
1/19/2011 10:18:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Fencing Improv.
Bid No. (xx-xx-xx)
05-06-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Request shall include: <br />1. Identification of the Project. <br />2. Description of affected work. <br />3. The necessity for cutting, alteration or excavation. <br />4. Effect on work of Owner or any separate contractor, or on structural or <br />weatherproof integrity of Project. <br />5. Description of proposed work: <br />a. Scope of cutting, patching, alteration, or excavation. <br />b. Trades who will execute the work. <br />C. Products proposed to be used. <br />d. Extent of refinishing to be redone. <br />6. Alternatives to cutting and patching. <br />7. Cost proposal, when applicable. <br />8. Written permission of any separate contractor whose work will be affected. <br />C. Submit written notice to the Engineer designating the date and the time work will be <br />uncovered. <br />PART 2- PRODUCTS <br />2.01 MATERIALS <br />A. Comply with specifications and standards for each specific project involved. <br />PART 3 - EXECUTION <br />3.01 INSPECTION <br />A. Inspect existing conditions of Project, including elements subject to damage or to <br />movement during cutting or patching. <br />B. After uncovering work, inspect conditions affecting installation of Products, or <br />performance of work. <br />C. Report unsatisfactory or questionable conditions to the Engineer in writing; do not proceed <br />with work until the Engineer has provided further instructions. <br />06/05 01045 -2 03- 4138.13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.