My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
O'Leary Richards
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-03-01) Landscape Architectural Firms
>
Responses
>
O'Leary Richards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 1:20:07 AM
Creation date
1/19/2011 3:48:38 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landscape Architectural Firms
Bid No. (xx-xx-xx)
06-03-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Present the Conceptual Design as well as the preliminary cost estimate to City <br />staff for review and approval. <br />' • Attend public presentations to the City Commission (if deemed advisable by the <br />City). <br />IV. Final Design / Contract Documents <br />• In close coordination with the City, final Construction Documents will be <br />' completed. <br />• Prepare a final and detailed estimate of Probable Construction Cost. <br />' V. Post Construction Watering and Maintenance <br />' • Prepare a Schedule of Maintenance requiring the Contractor to provide watering <br />and maintenance during the establishment period (if deemed advisable by City). <br />VI. Bidding Phase <br />• Attend pre -bid conference. <br />• Respond to written bidder inquiries. <br />• Review and evaluate competitive landscape and irrigation bids and make <br />recommendations. <br />' VII. Construction Administration <br />' • As directed by the City, act as the City's construction representative to include the <br />following: <br />• Attend pre - construction "kick -off' meeting. <br />' Review and approve all required Shop Drawings and Payment Requisitions. <br />• Review and answer contractor RFI's. <br />• Periodic site observation of the landscape and irrigation installation and reports on <br />same, as required. <br />• Select specimen plant material. <br />• Complete final punch list. <br />• Provide final acceptance correspondence to City. <br />' VIII. Final Project Submittal <br />• The final project contract documents will be submitted to the City of Sunny Isles <br />' Beach. One set of reproducible "As- built" plans and one compact disk or email <br />with the final dra.ving file in Autocad format. <br />
The URL can be used to link to this page
Your browser does not support the video tag.