My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-03-01) Landscape Architectural Firms
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 4:22:35 AM
Creation date
1/19/2011 3:56:31 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landsc. Architect. Firms
Bid No. (xx-xx-xx)
06-03-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Client <br />City of Weston <br />Contact information <br />at time ofproject <br />John Flint, City Manager <br />2500 Weston Road <br />Suite 101 <br />Weston, FL 33331 <br />9543852000 <br />Project Date <br />2003-2005 <br />Services Provided <br />Planting design, i/hguhon, <br />Elam <br />brick paver intersection <br />concept, curbing, drainage, <br />and pavement and striping <br />Key Personnel <br />TxmmyCnok4Noodon. <br />! <br />ASLA. RLA <br />� <br />Michael Conner, RLA <br />� <br />Sha in Hekmat, PE <br />~~~~ <br />Construction Estimate <br />of the Project Cost <br />$3.75 million <br />Amount cfInitial <br />Project <br />Contract Award <br />$3.740.270 (Phase |) <br />In Phase 1, CGA designed the roadway and landscape improvements to Weston Road in the <br />$1.187.891 (Phase 11) <br />City of Weston. In conjunction with the roadway overlays and widening designed by our <br />Engineering Department. the landscape improvements include median landscaping, brick <br />Number of Change <br />paver intersection and irrigation designs. . <br /><]ndom <br />� <br />3 (Phase |) <br />In Phase U. CGA was asked to design Phase U of the Weston Road Improvements which <br />3 (Phase U) <br />included landscaping for the andm 3.5 mile stretch length of the medians on Weston Road. ' <br />This phase also included median ourbing, drainage impnovemonto, and paving and striping <br />Value of Change <br />restoration. i <br />Orders <br />. i <br />$333.278 (Phase |) <br />| <br />i <br />$159,633 (Phase 10 <br />| <br />Amount of Initial Design <br />| <br />Foon <br />$5OO.UO0 (Phase |) <br />$121,239 (Phase 10 <br />Change Orders to <br />Design Contract and <br />Dollar Value <br />
The URL can be used to link to this page
Your browser does not support the video tag.