My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-03-01) Landscape Architectural Firms
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 4:22:35 AM
Creation date
1/19/2011 3:56:31 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landsc. Architect. Firms
Bid No. (xx-xx-xx)
06-03-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r" gK Ri- k.-:' y <br />r..a <br />4�w`i+ asc�WtJ <br />� fmit�mJr! ran t�- <br />t�0G1,FMAN 1'AR!t <br />Project <br />Fogleman Park is a 1.4 -acre neighborhood park located in an historic section of the City. <br />CGA provided design services as part of the City -wide Park Capital Improvement Program. <br />Physical improvements included a focal planter, a new playground, walking trails, lighting <br />and basketball courts. Additional amenities include turf and landscape areas and a new <br />irrigation system. The park is named for Sgt. James Fogleman, a Palm Beach County <br />Deputy Sheriff who lost his life in the line of duty in a traffic accident in March 1963 while <br />transporting a critically ill child to St. Mary's Hospital. CGA was proud to be one of the <br />primary sponsors of the parks rededication on May 11, 2002. <br />Client <br />City of West Palm Beach <br />Contact information <br />at time of project: <br />Jeff Halverson <br />Capital Projects Manager <br />Public Utilities Department <br />1000 45th Street <br />Suite 15 <br />West Palm Beach, FL 33402 <br />561 659 8040 <br />Project Date <br />Design: 2001 <br />Construction: 2002 <br />Project Value <br />Design: $40,000 <br />Construction: $ 408,000 <br />Services Provided <br />Site Engineering <br />Construction Documentation <br />Bid Document Preparation <br />Key Personnel <br />John Downes, PE <br />Scott S. Brunner, PE <br />
The URL can be used to link to this page
Your browser does not support the video tag.