My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-03-01) Landscape Architectural Firms
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 4:22:35 AM
Creation date
1/19/2011 3:56:31 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landsc. Architect. Firms
Bid No. (xx-xx-xx)
06-03-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />• One hardcopy and one digital copy meeting notes <br />TASK 6: COMMUNITY WORKSHOP <br />' Task 63: Community Workshop <br />' CGA will coordinate with the City and community stakeholders a public community meeting to present the revised <br />"Preliminary Design" concepts. Community members will comment on the design concepts in order to identify <br />what elements and characteristics about each resonates with their community, needs, issues and values. The <br />' community will be encouraged to vote on a preferred alternative to serve as a base for the articulation of all <br />gathered comments in future revisions. <br />City will provide venue and food, if required, for community meeting. <br />' Task Summary of Meetings and Deliverables: <br />' • One formal presentation <br />• One hardcopy and one digital copy rendered "Preliminary General Plan" concepts (minimum two <br />concepts) consisting of 24" x 36" site plans with text summary, <br />' Hardcopies of handouts <br />• One hardcopy and one digital copy community meeting summary memo <br />TASK 7: CONCEPT SELECTION AND COMPLETION OF A PREFERRED DESIGN AND REPORT <br />Task 7.1: Preferred Design Selection Meeting <br />CGA will meet with the City to review community feedback and evaluate the "Preliminary Plan" concepts and <br />determine a preferred direction for refinement and revision of the Final Design. CGA will forward a summary of <br />the meeting notes from the "Preferred Design Selection" meeting to the City. <br />Task 7.2: Preferred Design Recommendations <br />CGA will prepare a written summary memorandum for the project. Within this memorandum, CGA will confirm <br />with the City which information is to be included in the project that is necessary to communicate the intent and <br />findings of the "Final Design ". CGA will forward a summary memorandum of the "Preferred <br />Design' recommendations to the City. <br />Task Summary of Meetings and Deliverables: <br />• One hardcopy and one digital copy of Design Recommendation Strategy. <br />Task 7.3: Final Design <br />' CGA will prepare a Final Design for the park, consisting of supporting graphics of the final design and including <br />probable cost to develop the project. If requested, CGA will be prepared to make up to three (3) minor revisions to <br />the "Final Plan," as requested by the City. <br />City of Sunny Isles Beach, Florida <br />Landscape Architectural Firm(s) <br />' RFQ ;Vo. 06 -03 -01 <br />April 3, 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.