My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-03-01) Landscape Architectural Firms
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 4:22:35 AM
Creation date
1/19/2011 3:56:31 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landsc. Architect. Firms
Bid No. (xx-xx-xx)
06-03-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />Calvin, Giordano & Associates, <br />Task Summary of Meetings and Deliverables: <br />• One meeting with the City <br />• One hardcopy and one digital copy of meeting notes <br />• One hardcopy and one digital copy "Preferred Design" summary memo <br />• One bound hardcopy and one digital copy Final Design with cost estimate and rendered "Final Design" <br />• One 24" x 36" hardcopy "Final Design ". <br />• One digital copy (JPEG format) rendered "Final Design" by itself <br />• Three minor revisions to design per review and approval <br />TASK 8: FINAL DESIGN ADOPTION <br />Task 8.1: Commission Presentation <br />CGA will coordinate with the City to provide a presentation to the City's Commissioners for the adoption of the <br />Final Design. CGA will provide a digital presentation with all necessary graphic images to convey the character, <br />items, and conditions of the project. <br />Task Summary of Meetings and Deliverables: <br />• One meeting with the City <br />• One presentation to the city Commission <br />• Hardcopy handouts as needed <br />• One hardcopy and one digital copy of presented materials <br />TASK 9: CONSTRUCTION DOCUMENTATION AND ADMINISTRATION <br />Task 93: Construction Documents (Site Plan, Site Engineering & Irrigation Design) <br />CGA will prepare detailed Construction Documents and Specifications for the project. Plans will be submitted at <br />30 %, 60% and 90% completion for City to review and comment. The Cost Estimate will be updated with each <br />submittal, comparing allocated funds, and recommendations will be provided if probable construction cost exceeds <br />construction budget. A final 100% completion signed- and - sealed submittal set will be prepared, including all <br />necessary information as required by the project for regulatory approval. <br />Task Summary of Meetings and Deliverables: <br />' • 30% Submittal Package with attached cost estimate <br />• 60% Submittal Package with attached cost estimate <br />• 90% Submittal Package with attached cost estimate <br />' 0 100% Submittal Signed and Sealed Construction Package with attached cost estimate, and <br />• One meeting with City. <br />Task 9.2: Bidding Assistance /Construction Administration <br />CGA may assist the City in comparing all proposed bids for construction and will make recommendations for <br />' selection. CGA may provide construction administration of the construction contract, including: <br />City (? f Sunny Isles Beach, Florida <br />Landscape Architectural Firnn(s) <br />RFQ No. 06 - 03 -01 <br />April 3, 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.