My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Miller Leg
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-03-01) Landscape Architectural Firms
>
Responses
>
Miller Leg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 8:39:00 AM
Creation date
1/19/2011 4:01:13 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landsc. Architect. Svcs.
Bid No. (xx-xx-xx)
06-03-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Project Approach <br />In order to enhance the quality of life for their residents, many municipalities have been <br />improving the aesthetics of the roadway corridors that transect their cities. For the City <br />of Sunny Isles Beach, the improvement of the existing streetscapes within the City is a <br />high priority. Therefore, Miller Legg has chosen this type of project to demonstrate a <br />project approach. This approach outline can also be employed for other project types. <br />Miller Legg is able to effectively provide <br />excellent service and timely responsiveness to <br />the requirements of the City of Sunny Isles <br />Beach for a roadway landscape enhancement <br />project. Special consideration will be given to <br />the proposed schedule and budget <br />requirements. Miller Legg has demonstrated <br />its ability to complete projects with <br />personalized and responsive service on time <br />and within budget for other municipalities. <br />This project approach has been successfully <br />used in other streetscape designs for FDOT, <br />Coconut Creek, Tamarac, and the Broward <br />County Environmental Protection Department. <br />Key elements of this approach include <br />schedule, cost, and quality control. <br />The following is an outline for the program and <br />approach for a City of Sunny Isles Beach <br />median streetscape enhancement project that <br />includes landscaping, irrigation, and curbing <br />elements. <br />ITask 1: Coordination and Conceptual Design <br />' Prior to commencing the design work, the Miller Legg Project Manager will meet <br />with the City in order to establish the design program and budget for the project. <br />Typically, this task is coordinated through review of the City's Capital <br />Improvement Plan (CIP), existing maintenance budget, and input from adjacent <br />property owners. Using this information, Miller Legg will develop a preliminary <br />concept plan to graphically depict potential improvements that can be <br />' implemented within budget, while meeting the needs of the City, its residents, <br />and the ultimate users of the project. <br />Based upon the approved conceptual design, the City and Miller Legg will <br />establish a scope and schedule for the desired improvements. This schedule <br />would take into consideration grant application deadlines, City fiscal year <br />' expenditure requirements, and resident expectations. Typically, for this type of <br />\\>000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.