Laserfiche WebLink
M ILLER�`�EGG <br />FDOT VI Biscayne Boulevard ENE 5th Street to NE <br />13th Street) <br />Miomi, Floiido <br />In order to continue the enhancements of the U.S. I Corridor <br />for the City of Miami, Miller Legg developed a streetscape <br />design to unify the area surrounding the American Airlines <br />Arena Bicentennial Park and the new Performing Arts Center. <br />Enhancement of the pedestrian corridor and integration with <br />the existing Roberto Burle Marx paving design, directly to the <br />south, was integral in the design of the project. <br />Miller Legg coordinated with the City of Miami during the <br />design process, participated in numerous public involvement <br />and design meetings, and incorporated access management <br />concepts, including limited vehicular access and multi -modal <br />transportation. Improvements included specialty paving, <br />lighting, irrigation and planting elements. <br />Client(s): <br />Florida Department of Transportation - District VI <br />L; <br />11,+��1 X111 W4* 1W -aIIR jW. <br />s � eau vH tt.D. p, LL � H3 F <br />q 4 <br />L <br />IMPROVING COMMUNITIES. CREATING ENVIRONMENTS. <br />Iwww.millerlegg.com <br />