My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-01) Beach Access Signs
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 3:49:41 AM
Creation date
1/20/2011 3:10:14 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Beach Access Signs
Bid No. (xx-xx-xx)
06-06-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� I <br />PART 1 - GENERAL REQUIREMENTS <br />1.01 General <br />Provide signage in accordance with requirements of the Contract Documents. <br />Fabricator must perform as required by contract, coordinate all work and meet all <br />schedules. Fabricator representative required to coordinate all scheduling with <br />Client. Fabricator is expected to cooperate fully with the Client and Designer to <br />expedite, facilitate the prompt and accurate completion /delivery of the signage <br />elements. He or she shall coordinate with other contractors and suppliers of <br />equipment and services which the Engineer /Owner may engage outside of his <br />contract. <br />1.02 Pre - Construction Requirements <br />Contractor to establish final specifications and proper channels for coordination. <br />Contractor to provide all samples requested by Designer /Client Representative. <br />1.03 Submittals by Fabricator <br />A. Submit Shop Drawings for approval by Designer /Client. Furnish elevations, <br />details of fabrication including all materials, shapes, dimensions, finishes, <br />design loads, anchorage, and method of connections. Show all dimensions <br />of letter forms. All sign faces to be laid out and submitted to Designer for <br />Approval. <br />B. Samples <br />Fabricator must match all custom paint and materials as specified by <br />Designer. Each paint sample on suitable substrate shall be submitted to <br />Designer prior to the commencement of fabrication. <br />Submit three (3) sets (for review /approval by Client and Designer) of non- <br />returnable samples of each custom color, material or finish as specified in <br />these design documents. <br />C. Electrical Files <br />The Designer shall provide electronic files in an Apple /Mac format. <br />Fabricator to purchase proper type faces for the completion of the job. <br />Because it is expected that the awarded firm will have suitable software and <br />a computer to open files, full size patterns of signs are NOT required. <br />' D. Supplementary Product Literature (not part of this contract) <br />The Fabricator will furnish Designer /Client, with Fabricators' literature <br />describing the general properties of each product to be used in the Work. <br />' 05/06 1 - <br />03 4122.E <br />
The URL can be used to link to this page
Your browser does not support the video tag.