Laserfiche WebLink
B. On request of the Engineer, submit documentation to verify accuracy of <br />field engineering work. <br />C. Submit certificate signed by registered engineer or surveyor certifying that <br />elevations and locations are in conformance or non - conformance, with <br />Contract Documents. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br />END OF SECTION <br />06/06 01050 -2 03-4138.0 <br />