My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-02) Alley Way Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:06:34 AM
Creation date
1/20/2011 3:56:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Alley Way Improvments
Bid No. (xx-xx-xx)
06-06-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01090 <br />REFERENCES <br />PART 1 - GENERAL <br />1.01 GENERAL <br />A. Applicable Publications: Whenever in these specifications references are <br />made to published specifications, codes, standards, or other <br />requirements, it shall be understood that wherever no date is specified, <br />only the latest specifications, standards, or requirements of the respective <br />issuing agencies which have been published as of the date that the <br />WORK is advertised for bids, shall apply; except to the extent that said <br />standards or requirements may be in conflict with applicable laws, <br />ordinances, or governing codes. No requirements set forth herein or <br />shown on the drawings shall be waived because of any provision of, or <br />omission from, said standards or requirements. <br />B. Specialists, Assignments: In certain instances, specification text requires <br />p q <br />(or implies) that specific work is to be assigned to specialists or expert <br />entities, who must be engaged for the performance of that work. Such <br />assignments shall be recognized as special requirements over which the <br />CONTRACTOR has no choice or option. These assignments shall not be <br />interpreted so as to conflict with the enforcement of building codes and <br />similar regulations governing the WORK; also they are not intended to <br />interfere with local union jurisdiction settlements and similar conventions. <br />Such assignments are intended to establish which party or entity involved <br />in a specific unit of work is recognized as expert for the indicated <br />construction processes or operations. The final responsibility for <br />fulfillment of the entire set of contract requirements remains with the <br />CONTRACTOR. <br />1.02 REFERENCE SPECIFICATIONS, CODES, AND STANDARDS <br />A. Without limiting the generality of other requirements of the specifications, <br />all work specified herein shall conform to or exceed the requirements of <br />the following documents to the extent that the provisions of such <br />documents are not in conflict with the requirements of these Specifications <br />nor the applicable codes. <br />B. References herein to "Building Code" or SFBC shall mean the South <br />Florida Building Code. The latest edition of the code as approved and <br />used at the local agency having jurisdiction, shall apply to the WORK <br />herein, including all addenda, modifications, amendments, or other lawful <br />changes thereto. <br />06/06 <br />01090 -1 03- 4138.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.