My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-02) Alley Way Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:06:34 AM
Creation date
1/20/2011 3:56:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Alley Way Improvments
Bid No. (xx-xx-xx)
06-06-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01200 <br />PROJECT MEETINGS <br />PART 1 - GENERAL <br />1.01 REQUIREMENTS INCLUDED <br />A. The Engineer shall schedule and administer pre- construction meetings, <br />periodic progress meetings, and specially called meetings throughout the <br />progress of work. The Engineer shall: <br />1. Prepare agenda for meetings. <br />2. Make physical arrangements for meetings. <br />3. Preside at meetings. <br />4. Record the minutes; include significant proceedings and decisions. <br />5. Reproduce and distribute copies of minutes within five working <br />days after each meeting. <br />a. To participants in the meeting. <br />b. To parties affected by decisions made at the meeting. <br />B. Representatives of contractors, subcontractors and suppliers attending <br />meetings shall be qualified and authorized to act on behalf of the entity <br />each represents. <br />C. The Contractor shall attend meetings to ascertain that work is executed <br />consistent with Contract Documents and construction schedules. <br />1.02 RELATED REQUIREMENTS <br />A. Section 01310: Construction Schedules. <br />B. Section 01340: Shop Drawings, Working Drawings, and Samples. <br />C. Section 01720: Project Record Documents. <br />1.03 PRE - CONSTRUCTION MEETING <br />1. Schedule a pre- construction meeting no later than 15 days after date of <br />Notice to Proceed. <br />06/06 01200 -1 03- 4138.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.