My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-02) Alley Way Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:06:34 AM
Creation date
1/20/2011 3:56:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Alley Way Improvments
Bid No. (xx-xx-xx)
06-06-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />(i) impacts Project's critical path, (ii) consumes available float or <br />contingency time, and (iii) extends work beyond contract <br />completion date. <br />7. If the Contractor provides an accepted schedule with an early <br />completion date, the Owner reserves the right to reduce the <br />duration of the work to match the early completion date by issuing a <br />deductive Change Order at no change in Contract Price. <br />B. Submittals Schedule for Shop Drawings, and Samples in accordance with <br />Section 01340. Show: <br />1. The dates for Contractor's submittals. <br />2. The date submittals will be required for owner furnished products, if <br />applicable. <br />3. The dates approved submittals will be required from the Engineer. <br />C. A list of all long lead items (equipment, materials, etc). <br />1.05 PROGRESS REVISIONS <br />A. Indicate progress of each activity to date of submission. <br />B. Show changes occurring since previous submission of schedule: <br />1. Major changes in scope. <br />2. Activities modified since previous submission. <br />3. Revised projections of progress and completion. <br />4. Other identifiable changes. <br />C. Provide a narrative report as needed to define- <br />1 . Problem areas, anticipated delays, and the impact on the schedule. <br />2. Corrective action recommended, and its effect. <br />The effect of changes on schedules of other prime contractors. <br />1.06 SUBMISSIONS <br />06/06 <br />A. Submit initial schedules to the Engineer within 10 days after the effective <br />date of the Agreement. <br />01310 -3 <br />03-4138.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.