My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-02) Alley Way Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:06:34 AM
Creation date
1/20/2011 3:56:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Alley Way Improvments
Bid No. (xx-xx-xx)
06-06-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Scale and spacing: To allow space for notations and future <br />revisions. <br />4. Minimum sheet size: 24 inches x 36 inches. <br />B. Format of listings: The chronological order of the start of each item of <br />work for each structure. <br />C. Identification of listings: By major specification section numbers as <br />applicable and structure. <br />1.04 CONTENT OF SCHEDULES <br />A. Construction Progress Schedule: <br />1. Show the complete sequence of construction by activity. <br />2. Show the dates for the beginning of, and completion of, each major <br />element of construction in no more than a two -week increment <br />scale. Specifically list, but not limited to: <br />a. Receiving Materials <br />b. Pipeline Installations <br />C. Testing <br />d. Restoration <br />e. Startup <br />f. Record Drawings <br />g. Permits <br />h. Punch List <br />i. Owner Activities, Including Inspections <br />3. Show projected percentage of completion for each item, as of the <br />first of each month. <br />4. Show projected dollar cash flow requirements for each month of <br />construction. <br />5. Use of float suppression techniques such as preferential <br />sequencing or logic, special lead /lag logic restraints, and extended <br />activity times are prohibited, and use of float time disclosed or <br />implied by use of alternate float - suppression techniques shall be <br />shared to proportionate benefit of the Owner and Contractor. <br />6. Pursuant to above float- sharing requirement, no time extensions <br />will be granted nor delay damages paid until a delay occurs which <br />06/06 01310 -2 03- 4138.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.