My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-02) Alley Way Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:06:34 AM
Creation date
1/20/2011 3:56:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Alley Way Improvments
Bid No. (xx-xx-xx)
06-06-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />t <br />SECTION 01340 <br />SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES <br />PART 1 - GENERAL <br />1.01 REQUIREMENTS INCLUDED <br />A. The Contractor shall submit to the Engineer for review, such working <br />drawings, shop drawings, test reports and data on materials and <br />equipment (hereinafter in this article called data), and material samples <br />(hereinafter in this article called samples) as are required for the proper <br />control of work, including but not limited to those working drawings, shop <br />drawings, data and samples for materials and equipment specified <br />elsewhere in the Specifications and in the Contract Drawings. <br />B. Within thirty (30) calendar days after the effective date of the Agreement, <br />the Contractor shall submit to the Engineer a complete list of preliminary <br />data for which Shop Drawings are to be submitted. Included in this list <br />shall be the names of all proposed manufacturers furnishing specific <br />items. Review of this list by the Engineer shall in no way expressed or <br />implied relieve the Contractor from submitting complete Shop Drawings <br />and providing materials, equipment, etc., fully in accordance with the <br />Specifications. This procedure is required in order to expedite final review <br />of Shop Drawings. <br />C. The contractor is to maintain an accurate updated submittal log and will <br />bring this log to each scheduled progress meeting with the Owner and <br />Engineer. This log should include the following items- <br />1 . Submittal- Description and Number assigned. <br />2. Date to Engineer. <br />3. Date returned to Contractor (from Engineer). <br />4. Status of Submittal (Approved /Resubmit/Rejected). <br />5. Date of Resubmittal and Return (as applicable). <br />6. Date material released (for fabrication). <br />7. Projected date of fabrication. <br />8. Projected date of delivery to site. <br />01340 -1 <br />03-4138.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.