Laserfiche WebLink
1 1.02 RELATED REQUIREMENTS <br />A. Section 01600: Material and Equipment <br />B. Section 01720: Project Record Documents <br />' C. Designate in the construction schedule, or in a separate coordinated <br />schedule, the dates for submission and the dates that reviewed Shop <br />Drawings, Working Drawings and Samples will be needed. <br />1.03 CONTRACTOR'S RESPONSIBILITY <br />rA. It is the duty of the Contractor to check all drawings, data and samples <br />prepared by or for him before submitting them to the Engineer for review. <br />Each and every copy of the Drawings and data shall bear Contractor's <br />stamp or will be returned to the Contractor for conformance with this <br />requirement. Shop drawings shall indicate any deviations in the submittal <br />from requirements of the Contract Documents. <br />: <br />Determine and verify: <br />y <br />1. Field measurements <br />2. Field construction criteria <br />3. Catalog numbers and similar data <br />4. Conformance and Specifications <br />C. The Contractor shall furnish the Engineer a schedule of Shop Drawing <br />submittals fixing the respective dates for the submission of shop and <br />working drawings, the beginning of manufacture, testing and installation of <br />materials, supplies and equipment. This schedule shall indicate those that <br />are critical to the progress schedule. <br />D. The Contractor shall not begin any of the work covered by a drawing, <br />data, or a sample returned for correction until a revision or correction <br />thereof has been reviewed and returned to him, by the Engineer <br />approved. <br />E. The Contractor shall submit to the Engineer all drawings and schedules <br />sufficiently in advance of construction requirements to provide no less <br />than twenty -one (21) calendar days for checking and appropriate action <br />from the time the Engineer receives them. <br />06/06 01340 -2 03-4138.0 <br />1 <br />