My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-02) Alley Way Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:06:34 AM
Creation date
1/20/2011 3:56:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Alley Way Improvments
Bid No. (xx-xx-xx)
06-06-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. The Contractor shall submit three (3) copies of descriptive or product data <br />submittals to complement shop drawings for the Engineer plus the <br />number of copies that the Contractor requires. The Engineer will retain <br />three (3) sets. All blueprint shop drawings shall be submitted with one (1) <br />set of reproducible and four (4) sets of print. The Engineer will review the <br />drawings and return to the Contractor the set of marked -up drawings with <br />Iappropriate review comments <br />G. The Contractor shall be responsible for and bear all cost of damages that <br />may result from the ordering of any material or from proceeding with any <br />part of work prior to the review by Engineer of the necessary Shop <br />Drawings. <br />1.04 ENGINEER'S REVIEW OF SHOP DRAWINGS <br />06/06 01340 -3 03- 4138.0 <br />A. <br />The Engineer's review of drawings, data and samples submitted by the <br />Contractor will cover only general conformity to the Specifications, <br />external connections, and dimensions that affect the installation. The <br />Engineer's review and exceptions if any, will not constitute an approval of <br />dimensions, quantities, and details of the material, equipment, device, or <br />item shown. <br />B. <br />The review of drawings and schedules will be general, and shall not be <br />9 g , <br />construed- <br />1 . As permitting any departure from the Contract requirements; <br />2. As relieving the Contractor of responsibility for any errors, including <br />details, dimensions, and materials; <br />3. As approving departures from details furnished by the Engineer, <br />except as otherwise provided herein. <br />' <br />C. <br />If the drawings or schedule as submitted describe variations per <br />subparagraph (1.05.C), and show a departure from the Contract <br />requirements which Engineers finds to be in the interest of the Owner and <br />to be minor as not to involve a change in the Contract Price or time for <br />performance, the Engineer may return the reviewed drawings without <br />noting an exception. <br />D. <br />When reviewed by the Engineer, each of the Shop Drawings will be <br />identified as having received such review being so stamped and dated. <br />Shop Drawings stamped "REJECTED" and with required corrections <br />shown will be returned to the Contractor for correction and re- submittal. <br />06/06 01340 -3 03- 4138.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.