My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-02) Alley Way Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:06:34 AM
Creation date
1/20/2011 3:56:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Alley Way Improvments
Bid No. (xx-xx-xx)
06-06-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Date of drawing or revision. <br />3. Name of project building or facility. <br />4. Name of contractor and subcontractor submitting drawing. <br />5. Clear identification of contents and location of work. <br />6. Specification title and number. <br />D. If drawings show variations from Contract requirements because of <br />standard shop practice or for other reasons, the Contractor shall describe <br />such variations in his letter of transmittal. If acceptable, proper adjustment <br />in the Contract shall be implemented where appropriate. If the Contractor <br />fails to describe such variations he shall not be relieved of the <br />responsibility for executing the work in accordance with the Contract, even <br />though such drawings have been reviewed. <br />E. Data on materials and equipment include, without limitation, materials and <br />equipment lists, catalog data sheets, cuts, performance curves, diagrams, <br />materials of construction and similar descriptive material. Materials and <br />equipment lists shall give, for each item thereon, the name and location of <br />the supplier or manufacturer, trade name, catalog reference, size, finish <br />and all other pertinent data. <br />F. For all mechanical and electrical equipment furnished, the Contractor shall <br />provide a list including the equipment name, address and telephone <br />number of the manufacturer's representative and service company so that <br />service and spare parts can be readily obtained. In addition, a <br />maintenance and lubrication schedule for each piece of equipment shall <br />be submitted along with each shop drawing submittal. <br />G. All manufacturers or equipment suppliers who propose to furnish <br />equipment or products under Divisions 11, 13, 15 and 16 shall submit an <br />installation list to the Engineer along with the required shop drawings. The <br />installation list shall include at least five installations where identical <br />equipment has been installed and has been in operation for a period of at <br />least one (1) year. <br />H. Only the Engineer will utilize the color "red" in marking Shop Drawing <br />submittals. <br />Before final payment is made, the Contractor shall furnish to Engineer two <br />(2) sets of record shop drawings all clearly revised, complete and up to <br />date showing the permanent construction as actually made for all <br />reinforcing and structural steel, miscellaneous metals, process and <br />01340 -5 03-4138.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.