My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-02) Alley Way Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:06:34 AM
Creation date
1/20/2011 3:56:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Alley Way Improvments
Bid No. (xx-xx-xx)
06-06-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01600 <br />MATERIAL AND EQUIPMENT <br />PART 1 - GENERAL <br />1.01 REQUIREMENTS INCLUDE <br />A. Material and equipment incorporated into the Work: <br />1. Conform to applicable specifications and standards. <br />2. Comply with size, make, type and quantity specified, or as <br />specifically approved in writing by the Engineer. <br />3. Manufactured and Fabricated Products: <br />a. Design, fabricate and assemble in accord with the best <br />engineering and shop practices. <br />b. Manufacture like part of duplicate units to standard sizes <br />and gauges, to be interchangeable. <br />C. Two or more items of the same kind shall be identical, by the <br />same manufacturer. <br />d. Products shall be suitable for service conditions. <br />e. Equipment capacities, sizes and dimensions shown or <br />specified shall be adhered to unless variations are <br />specifically approved in writing. <br />4. Do not use material or equipment for any purpose other than that <br />for which it is designed or is specified. <br />1.02 RELATED REQUIREMENTS <br />A. Section 0 10 10: Summary of Work <br />B. Section 01030: Special Project Procedures <br />C. Section 01340: Shop Drawings, Working Drawings and Samples <br />D. Section 01720: Project Record Documents <br />1.03 APPROVAL OF MATERIALS <br />A. Only new materials and equipment shall be incorporated in the work. All <br />materials and equipment furnished by the Contractor shall be subject to <br />06/06 01600 -1 03- 4138.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.