My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-02) Alley Way Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:06:34 AM
Creation date
1/20/2011 3:56:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Alley Way Improvments
Bid No. (xx-xx-xx)
06-06-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Note related Change Orders and mark -up of record drawings and <br />Specifications. <br />IEND OF SECTION <br />' <br />06/06 01700 -5 03- 4138.0 <br />E. <br />Record Sample Submitted: Immediately prior to the date or dates of <br />' <br />Substantial Completion, the Contractor will meet at the site with the <br />Engineer and the Owner to determine which of the submitted Samples <br />that have been maintained during progress of the Work are to be <br />transmitted to the Owner for record purposes. Comply with delivery to the <br />Owner's Sample storage area. <br />F. <br />Miscellaneous Record Submittals: Refer to other Specification Sections for <br />requirements of miscellaneous record - keeping and submittals in <br />connection with actual performance of the Work. <br />G. <br />At Contract close -out, deliver one copy of Record Documents to Engineer <br />for Owner. Accompany submittal with transmittal letter in duplicate <br />containing the following information- <br />1 . Date. <br />2. Project title and number. <br />3. Contractor's name and address. <br />4. Title and number of each Record Document. <br />5. Signature of Contractor or his authorized representative. <br />PART 2 - <br />PRODUCTS (Not Used) <br />PART 3 - <br />EXECUTION <br />3.01 FINAL CLEANING <br />A. <br />Remove temporary protection and facilities installed for protection of the <br />Work during construction. <br />B. <br />Comply with regulations of authorities having jurisdiction and safety <br />standards for cleaning. Do not burn waste materials. Do not bury debris or <br />excess materials on the Owner's property. Do not discharge volatile, <br />harmful or dangerous materials into drainage systems. Remove waste <br />materials from the site and dispose of in a lawful manner. <br />tC. <br />Where extra materials of value remaining after completion of associated <br />Work have become the Owner's property, arrange for disposition of these <br />materials as directed. <br />IEND OF SECTION <br />' <br />06/06 01700 -5 03- 4138.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.