My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rogar Management #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-02) Alley Way Improvements
>
Responses
>
Rogar Management #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 2:30:56 AM
Creation date
1/20/2011 4:06:34 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Alley Way Improvements
Bid No. (xx-xx-xx)
06-06-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />SECTION 00300 <br />BID FORM <br />Bid of G 6 C,Y' Ro-v\G � UA ��. v�"� C�9t,� S� �i �1Cj C}� %G����� (��c <br />Address __} . 0 . Lx ILA � 36U 14 l Ld ' it F '+ � 3 � � <br />Phone <br />To furnish all materials, equipment and labor and to perform all work in accordance with the Contract <br />Documents for construction of the following. Shadowbox Fence System consisting of furnishing and <br />installing 1,790 +/- linear feet of six -foot (6') high shadowbox fence and demolition and removal of all <br />structures within the alley way located in CITY OF SUNNY ISLES BEACH. <br />To: CITY OF SUNNY ISLES BEACH <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br />The undersigned Bidder has carefully examined the Bidding Documents and the site of the proposed work <br />and is familiar with the nature and extent of the work and any local conditions that may in any manner <br />affect the work to be done. <br />The undersigned Bidder agrees to do all the work and furnish all materials called for by the Bidding <br />Documents, in the manner prescribed therein and to the standards of quality and performance established <br />by the Engineer for the unit price amounts stated in the spaces herein provided, for each of the items or <br />combination of items stipulated. Unit price line items shall include cost of implementing all applicable <br />safety requirements. Bidder acknowledges that estimated quantities scheduled are approximated for the <br />sole purpose of obtaining comparative bids for determination of the lowest responsible bidder and actual <br />quantities required may increase or decrease. Bidder fiirther agrees that payments will be made on the <br />basis of actual quantities placed and accepted in the construction <br />06/06 00300-1 03- 4138.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.