Laserfiche WebLink
Alley Way Improvements <br />UNIT PRICE BID SCHEDULE <br />Item Estimated <br />No. Description Quantity Unit Unit Price Estimated Amount <br />I. DEMOLITION /SITE PREPARATION <br />1. Demolish and remove all existing structures <br />within the alley way <br />H. CIVIL WORK <br />2. Furnish and install six -foot (6') shadowbox <br />fence, including paint. <br />III. GENERAL <br />3. Maintenance of Traffic <br />4. Mobilization and Demobilization of all <br />equipment and personnel (not to exceed 5% of <br />total bid amount) <br />5. Contingency (20% of bid amount) <br />GRAND TOTAL (Items 1 -5) <br />d , l <br />(Authorized Signature) <br />v <br />1 LS $ (1l)$ . 00 <br />1,790 LF $ �� 6 6, $ <br />1 LS <br />$ P� 7 <br />l <br />(Written) <br />0 <br />(Date) <br />v f m r <br />06/06 00300 -2 03- 4138.0 <br />