My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-03) Town Center Park Entry Sign
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:32:06 AM
Creation date
1/20/2011 5:12:56 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Entry Sign
Bid No. (xx-xx-xx)
06-06-03
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.04 PROGRESS MEETINGS <br />A. Schedule regular periodic meetings. The progress meetings will be held <br />as required by progress of the work. <br />B. Hold called meetings as required by progress of the work. <br />C. Location of the meetings: Project field office of the Contractor or <br />Engineer. <br />D. Attendance: <br />1. Engineer, and his professional consultants as needed. <br />2. Subcontractors as appropriate to the agenda. <br />3. Suppliers as appropriate to the agenda. <br />4. Others as appropriate. <br />E. Suggested Agenda- <br />1 . Review, approval of minutes of previous meeting. <br />2. Review of work progress since previous meeting. <br />3. Field observations, problems, conflicts. <br />4. Problems which impede Construction Schedule. <br />5. Review of off site fabrication, delivery schedule. <br />6. Corrective measures and procedures to regain projected schedule. <br />7. Revisions to Construction Schedule. <br />8. Progress, schedule, during succeeding work period. <br />9. Coordination of schedules. <br />10. Review submittal schedules; expedite as required. <br />11. Maintenance of quality standards. <br />12. Pending changes and substitutions. <br />13. Review proposed changes for: <br />a. Effect on Construction Schedule and on a completion date. <br />07/06 01200 -3 05 -5564 <br />