Laserfiche WebLink
b. Effect on other contracts of the Project. <br />14. Other business. <br />15. Construction schedule. <br />16. Critical /long lead items. <br />F. The Contractor is to attend progress meetings and is to study previous <br />meeting minutes and current agenda items, in order to be prepared to <br />discuss pertinent topics such as deliveries of materials and equipment, <br />progress of work, etc. <br />G. The Contractor is to provide a current submittal log at each progress <br />meeting in accordance with Section 01340. <br />PART 2 - PRODUCTS (Not Used). <br />PART 3 — EXECUTION (Not Used). <br />END OF SECTION <br />07/06 01200 -4 05 -5564 <br />