Laserfiche WebLink
a. Electrical service <br />b. Controls <br />3. As- installed color -coded wiring diagrams <br />4. Operating procedures: <br />a. Routine and normal operating instructions <br />b. Sequences required <br />C. Special operating instructions <br />5. Maintenance procedures: <br />a. Routine operations <br />b. Guide to "trouble- shooting" <br />C. Disassembly, repair and reassembly <br />d. Adjustment and checking <br />Manufacturer's printed operating and maintenance instructions <br />7. List of original manufacturer's spare parts, manufacturer's current <br />prices, and recommended quantities to be maintained in storage. <br />8. Other data as required under pertinent sections of specifications <br />D. Prepare and include additional data when the need for such data <br />becomes apparent during instruction of Owner's personnel. <br />E. Additional requirements for operating and maintenance data: Respective <br />sections of Specifications. <br />F. Provide complete information for product specified. <br />1.08 SUBMITTAL SCHEDULE <br />A. Submit two copies of preliminary draft of proposed formats and outlines of <br />contents of Operation and Maintenance Manuals within 30 days after <br />Notice to Proceed. <br />1. The Engineer will review the preliminary draft and return one copy <br />with comments. <br />B. Submit two copies of completed data in final form no later than 30 days <br />following the Engineer's review of the last shop drawing and submittal <br />specified under Section 01340. <br />1. One copy will be returned with comments to be incorporated into <br />final copies. <br />C. Submit specified number of copies of approved data in final form directly <br />07/06 01730 -6 05 -5564 <br />