Laserfiche WebLink
t <br />i� <br />l <br />1 <br />t <br />t <br />1 <br />to the offices of the Engineer, Calvin, Giordano within 30 calendar days of <br />product shipment to the project site and preferably within 30 days after the <br />reviewed copy is received. <br />D. Submit six copies of addendum to the operation and maintenance <br />manuals as applicable and certificates as specified in paragraph 1.01B of <br />Section 01030 within 30 days after final inspection and plant start-up test. <br />E. Final Operation and Maintenance submittals shall be in large three ring <br />binders organized by specification Section and plainly marked per <br />paragraph 1.04(C). <br />1.09 INSTRUCTION OF OWNER'S PERSONNEL <br />A. Prior to final inspection or acceptance, fully instruct Owner's designated <br />operating and maintenance personnel in operation, adjustment and <br />maintenance of products, equipment and systems. <br />B. Operating and maintenance manual shall constitute the basis of <br />instruction. <br />1. Review contents of manual with personnel in full detail to explain all <br />aspects of operations and maintenance. <br />1.10 ENGINEER'S O & M CHECKLIST <br />A. The Engineer will review Operation and Maintenance Manuals submittals <br />on operating equipment for conformance with the requirements of this <br />Section. The review will generally be based upon the checklist presented <br />on the following pages (Table 01730) for the benefit of the Contractor and <br />his suppliers. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br />1 07/06 01730 -7 05 -5564 <br />