F <br />be compacted by a minimum of six coverages with the equipment <br />described below, to at least 98 percent of maximum dry density as <br />determined by AASHTO -T -180. Incidental compaction due to traffic by <br />construction equipment will not be credited toward the required minimum <br />coverages. <br />E. Common fill consisting of other than structural fill shall be placed and <br />compacted in a manner similar to that described above for structural fill, <br />with the following exception: layer thickness prior to compaction may be <br />increased the 12- inches in open area; and common fill except dike fill, <br />required below water level in peat excavation areas may be placed as one <br />lift, in- the -wet, to an elevation one foot above the water level at the time of <br />filling. <br />F. Compaction of the fill by such means shall be to the same degree of <br />compaction as obtained by rubber -tired or vibratory roller equipment, and <br />the Engineer may make the necessary tests to determine the amount <br />compactive effort necessary to obtain equal compaction. Large <br />compaction equipment shall not be used within 5 feet of structures. <br />Compaction equipment is subject to approval by the Engineer. <br />G. Place fill material in layers not more than 12- inches loose depth for <br />material compacted by hand - operated tampers. Use manually operated <br />sled -type vibratory compactors next to structures and confined areas not <br />accessible to heavy mechanical compaction equipment. <br />H. If the Engineer shall determine that added moisture is required, water <br />shall be applied by sprinkler tanks or other sprinkler systems, which will <br />insure uniform distribution of the water over the area to be treated, <br />' distribution of the water over the area to be treated, and give complete <br />and accurate control of the amount of water to be used. If too much water <br />is added, the area shall be permitted to dry before compaction is <br />' continued. <br />' I. The Contractor shall supply all hose, piping, valves, sprinklers, pumps, <br />sprinkler tanks, hauling equipment, and all other materials and equipment <br />necessary to place the water in the fill in the manner specified. <br />3.05 GRADING <br />' A. General: Uniformly grade fill areas within limits of project including <br />adjacent transition areas. Smooth finished surface within specified <br />tolerances, compact with uniform levels or slopes between points where <br />' elevations are shown, or between such point and existing grades. No soft <br />spots or uncompacted areas will be allowed in the work. <br />1 07/06 02220 -13 05 -5564 <br />