Laserfiche WebLink
D. Haunching <br />1. Proper haunching provides a major portion of the pipes strength <br />and stability therefore care must be exercised in insure placement <br />and compaction of the embedment material in the haunches. For <br />larger diameter pipes ( >30 ") embedment materials should be <br />worked under the haunches by hand. Haunching materials may be <br />Class I, II, or III and must be placed and compacted in 8" maximum <br />lifts, compacted to 90% standard proctor density. <br />E. Initial Backfill: <br />1. Initial backfill materials are required to a minimum of the pipe <br />diameter for proper structural performance of the pipe. The ASTM <br />specifications extend the initial backfill from the springline to 6 " -12" <br />above the pipe to provide protection for the pipe from construction <br />operations during placement of the final backfill and protect the <br />pipe form stones or cobbles in the final backfill. For proper <br />structural performance of the pipe, the initial backfill need only <br />extend to the pipe diameter. Class I, II, or III materials may be used <br />as initial backfill however: <br />a. Class I materials must be used in wet trenches if Class I <br />bedding and haunching materials are used. <br />b. Class II materials must be compacted in 6" lifts to 90% <br />standard proctor density. <br />C. Class III materials must be compacted in 6" lifts to 90% <br />standard proctor density. <br />F. Final Backfill: <br />1. Final backfill may be Class I, II, or III and must be placed and <br />compacted in 12" maximum lifts and compacted to a minimum of <br />85% standard proctor density to prevent excessive settlement at <br />the surface. <br />2.02 SUBMITTALS <br />A. The Contractor shall furnish the Engineer, for approval, a representative <br />sample of fill material obtained from on -site sources at least ten calendar <br />days prior to the date of anticipated use of such material. <br />B. For each material obtained from other than on -site sources, the <br />Contractor shall notify the Engineer of the source of the material and shall <br />17106 02221 -5 05 -5564 <br />