Laserfiche WebLink
3.04 STAKING AND GUYING <br />A. Designated material shall be staked and guyed according to procedures <br />described for new plant materials, Section 02490. <br />3.05 WATERING <br />A. Contractor shall be responsible for the manual watering of relocated plant <br />materials by providing a 90 -day watering program, until they are <br />established. <br />B. Following tree spading and /or relocation, trees and palms designated for <br />transplanting shall be watered twice a day for the first two weeks, every <br />two days for the third week to the sixth week following the installed date, <br />every third day for the remainder of the 90 day period, completely <br />saturating the root ball for a period of thirty consecutive days following <br />moving. Such watering shall thoroughly saturate the root ball to its full <br />depth. After ninety day watering period plant materials shall be watered <br />and maintained as according to procedures described for new plant <br />materials, Section 02490. <br />3.06 MAINTENANCE <br />A. All relocated plant materials shall be maintained immediately after each <br />item is planted and continued until final inspection and acceptance. <br />B. All relocated plant materials shall be maintained in accordance to <br />procedures described in Section 02490. <br />END OF SECTION <br />07/06 02481 -8 05 -5564 <br />