My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Johnson Engineering Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(16-12-01) Professional Planning and Zoning Cosult Svcs
>
Responses
>
Johnson Engineering Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 2:41:58 PM
Creation date
1/4/2017 2:37:07 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Equal Opportunity/Affirmative Action Employer <br />D. PROJECT APPROACH & UNDERSTANDING <br />City of Sunny Isles Beach | RFQ No. 16-12-01 <br />Professional Planning and Zoning Consulting Services, <br />including Civil and Traffic Engineering <br />Printed <br /> on <br />paper <br />4 <br />Innovation <br />We pride ourselves in thinking outside the box and developing innovative ways to tackle complex <br />issues within our unique Florida environment. From the largest to the smallest of projects, our <br />team truly enjoys challenging themselves to find creative solutions. We make innovation happen by <br />employing a diverse staff that collectively examines your project and then works together to arrive <br />at the optimal solution. We also understand that even similar projects may require fundamentally <br />different approaches given our dynamic environment. We can achieve this flexibility by understanding <br />local conditions and the changing regulatory environment. Experience has taught us you can’t always <br />approach a problem the same way. There may be a better way and we’d like to help the City in that <br />pursuit. <br />Collier County MPO <br />Public outreach is one area that requires constant innovation in approach. We expanded the outreach <br />efforts on behalf of the Collier MPO while working on their Bicycle and Pedestrian Safety Study. <br />Using multilingual media and <br />communication, we expanded <br />on the old model of outreach <br />by adding on-street intercepts <br />of bicyclists and pedestrians, and <br />on-bus signage with QR codes <br />to link bus riders to online safety <br />surveys. Formerly, hard copies <br />of surveys and website links to <br />surveys were only accessible to <br />those who looked for them… <br />our efforts reached the bicycle <br />and pedestrian community that <br />rarely had a voice by extending <br />our services beyond traditional <br />outreach methods. <br /> <br />Fort Myers Downtown Development <br />We have also applied an innovative strategy on behalf of the City of Fort Myers to bolster Downtown <br />development and redevelopment linked to a funding mechanism to support City priorities. Our team <br />has devised a strategy to quantify the “untapped” available utility capacity in the City’s existing and <br />planned infrastructure system to capitalize on this resource to stimulate private development. Surplus <br />utility capacity has been translated into equivalent dwelling units that may be allocated by the City to <br />developers who are seeking the opportunity to build more intensely in exchange for a proportionate <br />payment to a new Community Fund that helps the City accomplish needed public improvements. The <br />program helps the development community who needs more flexibility and relief from regulatory <br />barriers, and it helps the City maximize its resources and achieve goals to sustain the community <br />through redevelopment.
The URL can be used to link to this page
Your browser does not support the video tag.